Industrial valves production - Machinery and equipment
Bankruptcy 519/2021 - Milan Law Court
On sale machinery and equipment for the production of industrial valves
ATTENTION: the composition of lots has changed from the previous sales experiment
It is also possible to bid on Complete Lot (Lot 0) which includes all lots in auction.
For further information consult lot webpages
Lots are sold as is. Viewing is reccomended.
The withdrawal can be scheduled only after the successful tenderer has sent the Safety Plan, indicating: short risk report, names of the personnel who will carry out the withdrawal, DURC.
possible assignment to 3rd parties:
In the safety plan of the successful tenderer, the company in charge of the withdrawal must be indicated with the Safety Plan and its DURC attached
All means of transport that enter must be approved. The Safety Plan and sub Safety Plan must indicate the approval of the vehicles.
Awarded lots have to be paid within 1 days from awarding with the costs related to the sale and notary fees
the collection should absolutely be done before and no later than 7 days from the provisional award.
Awarded lots have to be paid within 1 days from awarding with the costs related to the sale and notary fees
the collection should absolutely be done before and no later than 7 days from the provisional award.