external suction system with filter, motor, collection silos and various connection pipes also inside the building - ref. 104
- Following the dismantling of the system, it will be the contractor's responsibility to close the openings on the facade/roof of the building. The disposal of any material contained in the above assets will be the responsibility of the contractor -
Server time Sat 21/12/2024 at 11:59 | Europe/Rome
- All the categories
- Alle the auctions
- Calendar
- Selected by Gobid
- Notices
- How to partecipate in auctions
- Sell with us
- Pricing
- Operations manual
- FAQ
Telematic Sales Manager and Advertising Site authorized by the Ministry of Justice