The lot includes:
HEATING Imp. Titpology: for "RADIANT TUBES" shed on the ceiling with micro-burners; for offices, with n. 3 wall boilers - ref. C.1)
AIR CONDITIONING For office premises: n. 12 heat pumps and n. 12 splits; for the metrology room: n. 1 heat pump with n. 2 split - ref. C.2)
Impact control unit Control unit with telephone dialer connected to multiple presence detectors and sensors on access points - ref. C.3)
ELECTRIC INSTALLATION M / B voltage system, with transformer in external cabin of 800 KVA power - ref. C.4)
VIDEO DOORPHONE SYSTEM - ref. C.5)
TELEPHONE Set up Wired system for n. 20 telephone requirements - ref. C.6)
COMPRESSED AIR Imp. Distributed on the whole shed. BOGE electric compressor, max pressure 10 bar - ref. C.7)
SUCTION unit Departments Carpentry - Resins - Painting - ref. C.8)
Orariu dal server gio 12/12/2024 ore 06:34 | Europe/Rome
- Tutte le categorie
- Tutte le aste
- Calendàri
- Selezionate da Gobid
- Annunci
- Come partecipà a le aste
- Vende co' noi
- Listin' de' prez
- Manuale operativ
- Dumande Frequenti
Gestore de le Vendite Telematiche e Sito de Pubblicità autorizzato dal Ministero de la Giustizia