combination of plant, machinery, equipment and vehicles
the bidder must arrange, at his sole responsibility, for the disposal of all the goods constituting the two lots purchased and not taken from
For lots located in Orbassano (lots from 1 to 60), the bidder must arrange, at his sole responsibility, to dismantle and remove the constituent goods within 240 days from the completion of the transfer, with a penalty of € 30.500,00 for each month or fraction of month of delay
For lots located in Milan (lots from 61 to 107), the bidder must provide, at his sole responsibility, for the dismantling and removal of the constituent goods within 150 days from the completion of the assignment, with a penalty of € 16.000,00 for each month or fraction of month of delay
Ora server Wed 11/12/2024 ore 15:55 | Europe/Rome
- Toate categoriile
- Toate licitațiile
- Calendar
- Selectate de Gobid
- Anunțuri
- Cum să participi la licitații
- Vindeți cu noi
- Listă de prețuri
- Manual de operare
- Întrebări frecvente
Gestionarul Vânzărilor Online și Site-ul de Publicitate autorizat de Ministerul Justiției