combination of plant, machinery, equipment and vehicles
the bidder must arrange, at his sole responsibility, for the disposal of all the goods constituting the two lots purchased and not taken from
For lots located in Orbassano (lots from 1 to 60), the bidder must arrange, at his sole responsibility, to dismantle and remove the constituent goods within 240 days from the completion of the transfer, with a penalty of € 30.500,00 for each month or fraction of month of delay
For lots located in Milan (lots from 61 to 107), the bidder must provide, at his sole responsibility, for the dismantling and removal of the constituent goods within 150 days from the completion of the assignment, with a penalty of € 16.000,00 for each month or fraction of month of delay
Hora do servidor Wed 11/12/2024 horas 15:56 | Europe/Rome
- Todas as categorias
- Todas as ações
- Calendário
- Selecionados por Gobid
- Anúncios
- Como participar em leilões
- Venda connosco
- Lista de preços
- Manual de operações
- Perguntas Frequentes
Gestor de Vendas Online e Site de Publicidade autorizado pelo Ministério da Justiça